Muth Road, Gogol, Margao

  • clover
  • clover
  • clover
  • clover
  • clover
  • clover

External Amenities:

Life needs to be pampered at times to bring out the true essence it holds. The project offers exquisite amenities and facilities to contemplate every detail of life with its true spirit.

  • Exclusively residential secured gated complex, so there is no infringement in your privacy
  • Elegantly designed entrance foyer
  • Landscaped Gardens
  • Clubhouse
  • Children's play area
  • 8 passengers automatic elevators with V3F drives
  • Stilt car parking, well Lit and numbered.
  • 24 X 7 CCTV surveillance for all entry and exit points
  • Wide stairways and walk ways.
  • Power back up for lifts and common lights


Internal Amenities:

Our life is inspiration in many ways. The aspects that inspire helped us to craft an internal space perfectly showcasing the elegance that life portrays.

  • Walls with white cement finish & acrylic emulsion paint.
  • Nano finished vitrified flooring
  • Laminated door shutters
  • Coated aluminum window shutters with safety grills
  • Natural stone window sills
  • Premium electrical fittings
  • Designer bathrooms with premium fittings
  • Wi-Fi enabled
  • DTH connection in rooms
  • Power back up for light and fan points in every room
  • AC / Water Purifier / Washing machine / Geyser Provision

Floor Unit No Project Type Builtup (Sq Mt) Open Terrace Availability
Upper Ground Floor A001 3BHK 137.52 12.84 Available
Upper Ground Floor A002 3BHK 138.04 12.38 Available
Upper Ground Floor A003 3BHK 137.52 12.38 Available
Upper Ground Floor A004 3BHK 137.52 12.84 Available
Floor Unit No Project Type Builtup (Sq Mt) Open Terrace Availability
First Floor A101 3BHK 137.52   Available
First Floor A102 3BHK 138.04   Available
First Floor A103 3BHK 137.52   Available
First Floor A104 3BHK     Booked
Floor C Unit No Project Type Builtup (Sq Mt) Open Terrace Availability
Second Floor A201 3BHK 137.52 7.59 Available
Second Floor A202 3BHK 138.04 7.13 Available
Second Floor A203 3BHK 137.52 7.13 Available
Second Floor A204 3BHK 137.52 7.59 Available
Floor Unit No Project Type Builtup (Sq Mt) Open Terrace Availability
Fourth Floor A401 2BHK 109.85 30.17 Available
Fourth Floor A402 2BHK 110.37 29.71 Available
Fourth Floor A403 2BHK 109.85 29.71 Available
Fourth Floor A404 2BHK 109.85 30.17 Available
Floor Unit No Project Type Builtup (Sq Mt) Open Terrace Availability
Upper Ground Floor B001 2BHK     Booked
Upper Ground Floor B002 2BHK 110.04 7.13 Available
Upper Ground Floor B003 2BHK 110.5 7.13 Available
Upper Ground Floor B004 2BHK 109.41 7.59 Available
Upper Ground Floor B005 2BHK 110.3 7.59 Available
Upper Ground Floor B006 2BHK 110.3 7.13 Available
Floor Unit No Project Type Builtup (Sq Mt) Open Terrace Availability
First Floor B101 2BHK     Booked
First Floor B102 2BHK 110.04   Available
First Floor B103 2BHK 110.5   Available
First Floor B104 2BHK 109.41   Available
First Floor B105 2BHK 110.3   Available
First Floor B106 2BHK     Booked
Floor C Unit No Project Type Builtup (Sq Mt) Open Terrace Availability
Second Floor B201 2BHK     Booked
Second Floor B202 2BHK     Booked (D)
Second Floor B203 2BHK 110.5 7.13 Available
Second Floor B204 2BHK 109.41 7.59 Available
Second Floor B205 2BHK 110.3 7.59 Available
Second Floor B206 2BHK 110.3 7.13 Available
Floor C Unit No Project Type Builtup (Sq Mt) Open Terrace Availability
Third Floor B301 2BHK     Booked
Third Floor B302 2BHK 110.04   Available
Third Floor B303 2BHK 110.5   Available
Third Floor B304 2BHK 109.41   Available
Third Floor B305 2BHK 110.3   Available
Third Floor B306 2BHK     Booked
Floor C Unit No Project Type Builtup (Sq Mt) Open Terrace Availability
Fourth Floor B401 2BHK 109.41 7.13 Available
Fourth Floor B402 2BHK 110.04 7.13 Available
Fourth Floor B403 2BHK 110.5 7.13 Available
Fourth Floor B404 2BHK 109.41 7.59 Available
Fourth Floor B405 2BHK 110.3 7.59 Available
Fourth Floor B406 2BHK 110.3 7.13 Available
  • Commenced in September 2015.
  • Expected completion: December 2016
  • Current Status: Block B - Plinth completed
  • Block C - footings in progress.

Site Plan & Location Map